SBWMA Admin Office Tenant Improvement Project

Engineer's Estimate: $1,100,000.000 | Work includes constructing private offices, a kitchenette, a conference room, two single occupant restrooms (one of which is accessible), storage space, a flex space, an accessible lift, a metal framed second floor, stairs to the second floor, a private room on the second floor, new mechanical system (ducts, registers, roof equipment, zoning boxes), new electrical (off of existing panels), new plumbing, modify fire sprinkler system, new lighting, floor finishes, acoustic baffles, and paint. Coordinate and install low voltage infrastructure with owner. Work shall be completed within 180 Days from the date when Contract Time commences to run.

Status

Bidding Closed

Prebid Date12/4/23 11:00am

Bid Date12/22/23 3:00pm

Company & Contacts

South Bayside Waste Management Authority
Joanne Nghiem  
bids@rethinkwaste.org

Location

1245 SAN CARLOS AVENUE, SUITE E, SAN CARLOS, CALIFORNIA 94070