Public Projects

Bids due in 19 days
8/14/24 2:00pm
Skyline Slurry Seal & Westmoor Avenue Quick Build
Bids due in 19 days
City of Daly City
Daly City, CA 94015
Engineer’s Estimate: $3,304,517.75 || The work includes but not limited to the removal of existing thermoplastic striping and markings, crack sealing, asphalt concrete deep-lift repairs, street cleaning, application of slurry seal, installation of thermoplastic striping and markings, installation of signs, installation of safety bar channelizers, replacement of sanitary sewer manhole frame and covers, replacement of water valve box and covers, replacement of monument box and covers, adjustment of SSMH and SDMH frame and covers and other utility covers to finished grade as directed by the engineer.
Bids due in 18 days
8/13/24 10:00am
Nunes Treatment Plant Hypochlorite Room Improvements Project
Bids due in 18 days
Coastside County Water District
Half Moon Bay, CA 94019
Engineer's Estimate: $85,000 || This Public Works Contract consists of improvements at Owner’s Nunes Treatment Plant Hypochlorite Room Improvements Project located at 500 Lewis Foster Drive, Half Moon Bay, California, 94019 per the Construction Documents, including but not limited to installation of Owner-furnished Sodium Hypochlorite Generator, air blower, and hydrogen detector; plumbing piping and supports; construction of reinforced concrete equipment pad; electrical work; floor spall repair, and chemicalresistant coating application.
Bids due in 27 days
8/22/24 2:00pm
2024 REBID - CIP 455-695 Lift Station 59 Effluent Line Improvements Project
Bids due in 27 days
City of Foster City
Foster City, CA 94404
Engineer's Estimate: $1.2-$1.4M | The Work shall include the following modifications, replacements and improvements: • Design, furnish, install, disassemble and hand over temporary bypass system; • Furnish and install new isolation knife gate valve on the manifold; • Furnish and install new ball valve; • Construct new flow meter vault with associated fittings and sump pump; • Connect new flowmeter to the control room and sump pump to existing panel inside pump house; • Leak test and hydrostatic pressure test of the new components and sub-systems; • Field calibration of flowmeter; • Final testing and commissioning of the project as a fully functional and operational system; • Cleanup and restoration of the construction work area within the LS59 yard construction zone.
Bids due in 7 days
8/2/24 10:00am
Ave 2-1, 2-2 Sewer & Water Replacement, Project No. 31009, 31010, 11008
Bids due in 7 days
City of San Bruno
San Bruno, CA 94406
Engineer’s Estimate: $10,779,500 | The work includes, but is not limited to: construct sanitary sewer main by open cut construction; construct water main by open cut construction; remove or abandon existing water mains; remove or abandon existing sewer mains; reconnect all lower laterals; remove and replace sanitary sewer manholes and drop manholes; construct sanitary sewer manholes and drop manholes; sewer flow control; full width pavement grind and overlay; hot mix asphalt base repair and deep lift stabilization; pavement delineation; install curb ramp and driveway approaches; modify or install catch basins and connect to existing storm drain structures; other work as shown on drawings.
Bids due in 20 days
8/15/24 2:00pm
Smart Corridors Northern Cities - Brisbane - Job No. 924D
Bids due in 20 days
City of Brisbane
Brisbane, CA 94005
Engineer's Estimate $3,028,750 |
Bids due in 13 days
8/8/24 2:00pm
CIP678 Recreation Center Rebuild Project
Bids due in 13 days
City of Foster City
650 SHELL BLVD. FOSTER CITY, CA 94404
ALL SUBCONTRACTORS INTERESTED IN THE PROJECT MUST SUBMIT QUESTIONS DIRECTLY TO THE 4 PRE-QUALIFIED GENERAL CONTRACTORS: SJ AMOROSO / SWINERTON / LATHROP / BHM. ONLY QUESTIONS RECEIVED FROM THESE GENERAL CONTRACTORS WILL BE ANSWERED. The last date the City will formally accept bidder questions on Addendum 2 is Tuesday, July 16, 2024. Any questions received after this date may not be responded to. || Engineer's Estimate: $48,300,000 || **ONLY BIDS FROM PREQUALIFIED CONTRACTORS WILL BE CONSIDERED** The Foster City Recreation Center (FCRC) is a new ground up facility with a Gross Square Footage of 37,940 SF and related site improvements. The Recreation Center Rebuild Project will include the following primary scopes of work: (1) Demolition of existing buildings; (2) New site utilities and landscaping; (3) Core and shell and tenant improvements; (4) Recreation Center program spaces and administration offices; (5) Food services; and (6) Outdoor event spaces
Bids due in 4 days
7/30/24 10:00am
Nunes Treatment Plant Paving Project
Bids due in 4 days
Coastside County Water District
Half Moon Bay, CA 94019
Engineer’s estimate: $397,000 | Work includes, without limitation: 1. Paving of approximately 18,270 (SF) of roadway and pavement, as shown on the Contract Drawings. 2. Installation of approximately 275 LF of 4-inch Ductile Iron Pipe (DIP) by open trench, as shown on the Contract Drawings. 3. Installation of approximately 310 LF of four 1-inch conduits by open trench construction 4. Connection of the new water to the existing 6-inch fire hydrant lateral.
Bids due in 42 days
9/6/24 2:00pm
Central Park Playground Improvements Project #610027
Bids due in 42 days
City of San Mateo Parks & Recreation Dep
50 East 5th Avenue, San Mateo, CA
Engineer’s Estimate $8,774,000.00: Demolition of existing play equipment, pathways, restroom building, and trees; Water pollution control and site protection measures; Tree removal and protection measures; Construct new custom play equipment and safety surfacing, new pre­ engineered restroom, new picnic structure and concrete pad, new pedestrian pavements, raised boardwalk, water feature, fencing, site furnishings, irrigation, planting, site utilities (water,sewer,stormwater drainage), signage,lighting and other specified improvements ; Construct new utility service connections in ROW of El Camino Real, State Route 82, under Encroachment Permit and jurisdiction of California Department of Transportation; Traffic and pedestrian control throughout construction.
Bidding Closed
7/12/24 2:00pm
Winter Storm Hazard Mitigation Project
Bidding Closed
City of San Bruno
Engineer's Estimate: $219,400 | The work includes but is not limited to: installing a soldier pile wall in cast-in-drilled-holes (CIDH) using W12x35 steel beams at a depth of 25 feet. The wall features 4 inch by 12 inch pressure treated wood lagging, spanning 42 feet long and 7 feet high. The project also consists of a subdrain system behind the proposed retaining wall.
Bids due in 20 days
8/15/24 2:00pm
Florida Avenue Park Construction - Project No. 51001
Bids due in 20 days
San Bruno Community Services Department
Florida Ave Park, San Bruno, CA 94066
The work includes, but is not limited to: Clearing and grubbing, grading, drainage, site furnishings, plantings, irrigation systems, pavements, concrete sidewalk, fencing and walls for a new park complex to be constructed on two parcels within the Crestmoor Neighborhood. Work includes furnishing and installing park play equipment, slides, tables, benches, chairs, drinking fountain and other appurtenances.