2021-22 Street Reconstruction Project

Engineers Estimate: $2.9 million | The work includes but is not limited to: Hot mix asphalt base repair and full depth reclamation, removing and replacing concrete sidewalk, curb and gutter, installing ADA compliant curb ramps, and replacing striping.
Addendum No. 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
00_50_20_Bid_Addendum_No._1 274.3 KB
Addendum No. 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
00_50_20_Bid_Addendum_No._2 279.5 KB
Addendum No. 3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
00_50_20_Bid_Addendum_No._3 5.1 MB