Downtown Beautification Project Phase II Landscaping, Irrigation and Planting CIP Project NO. 51039
This project comprises a comprehensive upgrade to the existing landscaping, irrigation and planting infrastructure for the Downtown Area of the City of San Bruno. The Downtown Beautification project encompasses a range of technical specifications across various disciplines, including demolition, site preparation, landscaping, and infrastructure installation. The work includes clearing and grubbing, trenching and backfilling, asphalt and concrete paving, decomposed granite paving, site furnishing installation, planting irrigation, landscape soil preparation, and landscape planting, all to be executed according to the specified materials, standards, and quality control measures outlined in the provided technical specifications.
Status
Accepting Bids
Prebid Date | 6/6/25 11:00am |
Bid Date | 6/26/25 2:00pm |