Alvarado Stairway Water Main Rehabilitation Project

Engineer's Estimate: $233,000.00 | The work to be performed under this contract shall consist of, in general, mobilization; providing traffic control; providing construction area signs; daily cleanup; testing; safety; trenchless water main rehabilitation using flexible fabric reinforced pipe (FFRP) and FFRP end connectors; final connections to the existing water main with new water main installed by open trench construction; fire hydrant lateral and assembly replacement; asphalt paving restoration; striping and marking restoration; utility adjustments; cleaning the site at the end of the job.
Addendum No. 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
921L Addendum No 1_2024-03-25 2.0 MB
Addendum No. 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
921L Addendum No 2_2024-04-05 1.2 MB