Alvarado Stairway Water Main Rehabilitation Project
Engineer's Estimate: $233,000.00 | The work to be performed under this contract shall consist of, in general, mobilization; providing traffic control; providing construction area signs; daily cleanup; testing; safety; trenchless water main rehabilitation using flexible fabric reinforced pipe (FFRP) and FFRP end connectors; final connections to the existing water main with new water main installed by open trench construction; fire hydrant lateral and assembly replacement; asphalt paving restoration; striping and marking restoration; utility adjustments; cleaning the site at the end of the job.