Mussel Rock Landfill Upper Disposal Area Pull-Back
Engineer’s Estimate: $1,926,000 | The work includes site clearing, excavating a portion of the upper disposal area, transporting the excavated material to the lower disposal area and capping both areas with a soil cover material. Work will also include associated earthwork and grading at the lower disposal and the upper disposal areas, traffic control throughout the project and associated stormwater pollution control during and after construction.
Addendum No. 1
(click to expand/collapse)

Name | Size | ||
Addendum #01_signed | 275.3 KB |
Addendum No. 2
(click to expand/collapse)

Name | Size | ||
Addendum #02_signed | 151.9 KB |
Addendum No. 3
(click to expand/collapse)

Name | Size | ||
Addendum #03_signed | 119.2 KB |
Clarification No. 1
(click to expand/collapse)

Name | Size | ||
Clarification #1_signed | 123.7 KB |