Street Rehabilitation and Park Pathway Restoration (CIP301-716)
Engineers Estimate: $2,000,000 | This project consists of striping removal, crack sealing, pavement grinding, localized asphalt concrete repair, asphalt overlays, slurry seal, pavement reconstruction, curb and gutter repair, curb ramp installment/replacement, installation of traffic striping and markings, installation of traffic signage, grade adjustments, bituminous layer repair, paver replacement, and utility adjustments.
Addendum No. 1
(click to expand/collapse)
Name | Size | ||
CIP716- Addendum 1 | 45.2 MB |