Ave 2-1, 2-2 Sewer & Water Replacement, Project No. 31009, 31010, 11008
Engineer’s Estimate: $10,955,320 | The work includes, but is not limited to: construct sanitary sewer main by open cut construction; construct water main by open cut construction; remove or abandon existing water mains; remove or abandon existing sewer mains; reconnect all lower laterals; remove and replace sanitary sewer manholes and drop manholes; construct sanitary sewer manholes and drop manholes; sewer flow control; full width pavement grind and overlay; hot mix asphalt base repair and deep lift stabilization; pavement delineation; install curb ramp and driveway approaches; modify or install catch basins and connect to existing storm drain structures; other work as shown on drawings.
Status
Bidding Closed
Prebid Date | 7/22/24 10:30am |
Bid Date | 8/6/24 11:00am |
Company & Contacts
City of San Bruno
Jake Zhang
(650) 616- 7065
Location
San Bruno, CA 94406