Skyline Slurry Seal & Westmoor Avenue Quick Build
Engineer’s Estimate: $3,304,517.75 || The work includes but not limited to the removal of existing thermoplastic striping and markings, crack sealing, asphalt concrete deep-lift repairs, street cleaning, application of slurry seal, installation of thermoplastic striping and markings, installation of signs, installation of safety bar channelizers, replacement of sanitary sewer manhole frame and covers, replacement of water valve box and covers, replacement of monument box and covers, adjustment of SSMH and SDMH frame and covers and other utility covers to finished grade as directed by the engineer.
Plans & Specs
(click to expand/collapse)