23-24 and 24-25 Street Rehabilitation Project No. 60039 & 60048
Engineer's Estimate: $6,200,000.00 || The work includes, but is not limited to: mobilization, traffic control, water pollution control, dust prevention and control, site cleanup, asphalt concrete grinding/removal, asphalt concrete installation, asphalt concrete base repair, ADA ramp construction, utility cover lowering & restoring to grade, loop detector replacement, striping removal & replacement at various locations Citywide.
Addendum No. 1
(click to expand/collapse)
Name | Size | ||
00_50_20_Bid_Addendum_01_9-4-24 | 260.7 KB | ||
San Bruno Pavement Rehab - Addendum 1 Plans | 92.4 MB | ||
San Bruno Pavement Rehab - Addendum 1 Specifications | 7.1 MB |
Addendum No. 2
(click to expand/collapse)
Name | Size | ||
00_50_20_Bid_Addendum_2 | 279.4 KB | ||
San Bruno Pavement Rehab - Addendum 2 Specifications | 7.1 MB | ||
San Bruno Pavement Rehab - Addendum 2_Plans | 82.6 MB |
Notice of Intent to Award
(click to expand/collapse)
Name | Size | ||
00_50_50_Notice_of_Intent_to_Award | 250.6 KB |