Serramonte Library - Elevator, Energy Efficiency, ADA Upgrades, HVAC, and Roof Replacement

Engineer's Estimate: $2,577,578.00 || The project is an accessibility and energy efficiency improvement project for the existing 2-story Serramonte Library building that was built in 1975. The scope of work includes installation of a new elevator to connect the upper and lower levels of the library, replacement of the existing interior lighting of the upper and lower levels including a new drop ceiling and associated fire sprinklers, renovations of the lower level restrooms to be ADA compliant, and replacement of the existing roof mounted mechanical air handler units and associated roof.
Addendum No. 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum #01_Serramonte Library_sc - Copy 560.6 KB
Addendum No. 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum 02 194.0 MB
Clarification #01 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Clarifications #01 159.9 KB
Pre-Bid 1 Attendance (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Serramonte Library Pre-Bid 1 Attendance 18.8 MB
Pre-Bid 2 Attendance (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Serramonte Library Pre-Bid 2 Attendance 1.2 MB