2025-26 Slurry Seal Project

Engineer's Estimate = $765,000 | The work includes, but is not limited to: performing base repair at identified locations, placing crack seal, slurry sealing existing street, replacing concrete curb and gutters, install traffic calming improvements and restriping existing striping markings. All work items shall be constructed in accordance with the contract plans and specifications. Bidding Documents contain the full description of the Work.
Plans (click to expand/collapse)