Evergreen/Winchester/Templeton Sewer Replacement Project
The work includes removing and replacing sanitary sewer mains, connecting sewer laterals to the new sanitary sewer main, removing and replacing sanitary sewer manholes, and connecting storm drain fly lines to the new sanitary sewer manholes. All surface improvements impacted by the work shall be restored, including but not limited to the street, sidewalk, curb, gutter, and median per City and District standards.
Specs
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| DalyCity_Evergreen_100_Specifications_2025-06-16 | 5.5 MB |