John Daly Boulevard/Skyline Boulevard Pedestrian Project

Engineer's Estimate: $1,122,152.50 | The work includes clearing and grubbing, grading, grinding existing asphalt concrete, paving with new asphalt concrete, reconstruction of curb, gutter, and curb ramps to meet current ADA standards, construction of new sidewalk, installation of new pedestrian street lights, installation of thermoplastic striping and markings, installation of traffic signs and posts, installation of new catch basin, and adjustment of utility manhole frames, covers and other utility boxes to finished grade and other work as shown on plans or as specified in the specifications.
Plans & Specs (click to expand/collapse)