Marina Lagoon Spot Dredging Project - 2026

Engineer's Estimate: $1,150,000.00 | The Project is located at the mouth of the Leslie Creek and Borel Creek at Marina Lagoon and is described as follows: The dredge, staging, and disposal of up to 2,000 cubic yards of sediment as described in the document titled, “Sediment Characterization Sampling and Analysis Plan (SAP) for the Dredging of Sediment from the Marina Lagoon in San Mateo, CA”, dated January 22, 2025, and as shown on the plans.
Specs (click to expand/collapse)
Name Size
Marina Lagoon Specs_FOR BID 10.7 MB