Central Park Playground Improvements Project #610027
Engineer’s Estimate $8,774,000.00: Demolition of existing play equipment, pathways, restroom building, and trees; Water pollution control and site protection measures; Tree removal and protection measures; Construct new custom play equipment and safety surfacing, new pre engineered restroom, new picnic structure and concrete pad, new pedestrian pavements, raised boardwalk, water feature, fencing, site furnishings, irrigation, planting, site utilities (water,sewer,stormwater drainage), signage,lighting and other specified improvements ; Construct new utility service connections in ROW of El Camino Real, State Route 82, under Encroachment Permit and jurisdiction of California Department of Transportation; Traffic and pedestrian control throughout construction.
Addendum No. 1
(click to expand/collapse)

Name | Size | ||
01 Addendum Central Park Playground Improvements Project 7.9.24 | 239.4 KB |
Addendum No. 2
(click to expand/collapse)

Name | Size | ||
02 Addendum Central Park Playground Improvements Project 7.23.24 | 507.6 KB |
Addendum No. 3
(click to expand/collapse)

Name | Size | ||
Addendum No. 3 Animal Tracks.dwg | 453.9 KB | ||
Addendum No. 3 Central Park Playground Improvements Project Issued 8.19.24 | 312.3 KB | ||
Plans_Central Park Playground_BID_20240819 | 156.6 MB | ||
Specifications_Central Park Playground_Bid_20240819 | 7.6 MB |
Addendum No. 4
(click to expand/collapse)

Name | Size | ||
04 Addendum Central Park Playground Improvements Project 8.22.24 | 266.0 KB | ||
Addendum #4 Bid Proposal | 166.1 KB |