Central Park Playground Improvements Project #610027
Engineer’s Estimate $8,774,000.00: Demolition of existing play equipment, pathways, restroom building, and trees; Water pollution control and site protection measures; Tree removal and protection measures; Construct new custom play equipment and safety surfacing, new pre engineered restroom, new picnic structure and concrete pad, new pedestrian pavements, raised boardwalk, water feature, fencing, site furnishings, irrigation, planting, site utilities (water,sewer,stormwater drainage), signage,lighting and other specified improvements ; Construct new utility service connections in ROW of El Camino Real, State Route 82, under Encroachment Permit and jurisdiction of California Department of Transportation; Traffic and pedestrian control throughout construction.
Status
Bidding Closed
Prebid Date | 7/17/24 8:00am |
Bid Date | 9/6/24 2:00pm |
Location
50 East 5th Avenue, San Mateo, CA
Please download the remainder of Addendum 3 here, as the files are kept in order by folder.
ADDENDUM No. 3 - As-Builts (Zip Folder)
http://uploadsd.barkerblue.com/ClientView/?req=epp&id=9XRYMO9F&xf=20240820-004