Biogas Utilization - GCS Installation, CIP# 9269

Engineer's Estimate: $5,500,000 | Scope of work includes the following key activities at a wastewater treatment plant. Excavation and construction of a concrete pad to support new equipment, installation of a Gas Conditioning System on the newly constructed concrete pad, installation of biogas and natural gas pipelines to integrate with existing infrastructure, installation of electrical systems, instrumentation and control components to support the operation and monitoring of the new system.

Status

Accepting Bids

Prebid Date 5/28/25 10:00am
Bid Date 6/26/25 2:00pm

Company & Contacts

Silicon Valley Clean Water
Jose Martinez  

MANDATORY Pre-bid Conference Date:  Wednesday, May 28, 2025, 10:00 AM PDT at 1400 Radio Road, 2nd Floor, Pelican Board Room, Redwood City, CA