Biogas Utilization - GCS Installation, CIP# 9269

Engineer's Estimate: $5,500,000 | Scope of work includes the following key activities at a wastewater treatment plant. Excavation and construction of a concrete pad to support new equipment, installation of a Gas Conditioning System on the newly constructed concrete pad, installation of biogas and natural gas pipelines to integrate with existing infrastructure, installation of electrical systems, instrumentation and control components to support the operation and monitoring of the new system.