Crestmoor Canyon Storm Repair Project No. 21016
Engineer’s Estimate is $138,000 | The work includes, but is not limited to: • Removing existing manhole • Installing drilled piers • Installing concrete base slab • Tie concrete base slab to existing soldier piles • Installing new precast concrete manhole
Addendum No. 1
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 00 50 20 Bid Addendum No. 1 | 1.7 MB |
Addendum No. 2
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 00 50 20 Bid Addendum No. 2 | 204.4 KB |

