Crestmoor Canyon Storm Repair Project No. 21016
Engineer’s Estimate is $138,000 | The work includes, but is not limited to: • Removing existing manhole • Installing drilled piers • Installing concrete base slab • Tie concrete base slab to existing soldier piles • Installing new precast concrete manhole
Plans
(click to expand/collapse)

Name | Size | ||
Crestmoor Canyon Storm Repair Project - Plan Set | 11.5 MB |