Shady Lane Storm Drain Replacement Project CIP No. 810
Engineers Estimate: $830,000 | This project includes installation of approximately 900 linear feet of dual walled HDPE storm drain pipe, subdrains, catch basins, manholes and an outfall on Shady Lane, Hillsborough. The work is to be complete within a period of 60 calendar days.
Addendum No. 1
(click to expand/collapse)

Name | Size | ||
Shady Lane 08-25-2025 Addendum 1 | 758.2 KB |
Preliminary Bid Results
(click to expand/collapse)

Name | Size | ||
Shady Lane_Prelim Bid Results 08-27-2025 | 58.6 KB |