Shady Lane Storm Drain Replacement Project CIP No. 810
Engineers Estimate: $830,000 | This project includes installation of approximately 900 linear feet of dual walled HDPE storm drain pipe, subdrains, catch basins, manholes and an outfall on Shady Lane, Hillsborough. The work is to be complete within a period of 60 calendar days.
Status
Accepting Bids
Prebid Date | 8/19/25 10:00am |
Bid Date | 8/27/25 2:00pm |
Location
Shady Lane @ W. Avondale Road Intersection, Hillsborough, CA 9010
For PDF download purchases, please create an account or login, and select "Download".
For physical prints, please select "Order".