Shady Lane Storm Drain Replacement Project CIP No. 810

Engineers Estimate: $830,000 | This project includes installation of approximately 900 linear feet of dual walled HDPE storm drain pipe, subdrains, catch basins, manholes and an outfall on Shady Lane, Hillsborough. The work is to be complete within a period of 60 calendar days.
Specs (click to expand/collapse)